Friday, August 15, 2008

More on electrical work

I have some more electrical work that needs to get done around the house. In particular, I need to get some additional electrical outlets installed in my three second-floor bedrooms. Unfortunately, this friend of mine says that this will take about five to six days to complete.

Ouch. I really don't like the idea of having to pay for that kind of labor. I wish that the previous owner had done a better job of maintaining the place. He was a realtor, for pity's sake, yet he displayed an appalling lack of foresight when it came to basic home maintenance. For pity's sake, he didn't even bother to get gutters installed on the garage, even though this would not have cost much. Nor did he get a cap installed on the chimney. Both of these were low-cost projects that could have vastly improved the property.

No foresight whatsoever.